You cannot manufacture, cost or supply a product without knowing exactly what it is made of. That is the job of the bill of materials, or BOM. Here is the definition, the tree structure, the single-level and multi-level types, concrete examples, and its central role in a manufacturing ERP.

Also called BOM A tree structure Master data of the manufacturing ERP Feeds the MRP calculation
Nomenclature (BOM) : définition et exemples

TL;DR, the essentials

  • A bill of materials (BOM) is the structured list of every component, material and sub-assembly needed to make a product, with their quantities.
  • It takes the form of a tree: a “parent” product breaks down into “child” items, which can themselves break down further.
  • You distinguish the single-level BOM (a single tier) from the multi-level BOM (several tiers of sub-assemblies).
  • It is the master data that feeds the material requirements calculation, product costing and purchasing inside an ERP.

You come across the term bill of materials, or its acronym BOM, in a manufacturing system, a spec sheet or a conversation with an engineering team, and you want a clear definition. Here it is: a BOM is the complete recipe of a product, the list of everything needed to make it, organized from the finished good down to the last screw. Below we explain its structure, its types, with examples, and why it sits at the heart of every manufacturing ERP.

What is a bill of materials, precisely?

A bill of materials is the exhaustive, structured list of a product’s components: raw materials, parts, sub-assemblies, sometimes consumables and tooling, each with its unit quantity. It is the industrial equivalent of a cooking recipe: it says which ingredients, and in what quantity, go into the finished product.

Without a reliable BOM, it is impossible to know what to order, how much a product really costs, or how to launch its production. That is why it is often called master data: many company functions depend on it, from purchasing to cost accounting.

In one sentence

A bill of materials answers a simple but fundamental question: what, and in what quantity, is this product made of?

How is a bill of materials structured?

A BOM is laid out as a tree structure. At the top, the finished product (the “parent” item). Below it, the components that make it up (the “child” items), each with its quantity. A component can itself be a sub-assembly that breaks down in turn, and so on down to raw materials and purchased parts.

Each link between a parent and a child carries a key piece of information: the quantity of the component needed for one unit of the parent. This nesting logic lets you, by moving up or down the tree, automatically calculate everything required to produce a given quantity. This is precisely the mechanism that the material requirements planning (MRP) exploits.

Finished product (parent)Sub-assembliesComponentsRaw materials
The tree logic of a bill of materials, from the finished product down to the raw material.

Single-level or multi-level BOM?

There are mainly two forms of bill of materials, depending on the depth of the tree:

  • The single-level BOM: it lists the components of the finished product directly, on one tier, without detailing the sub-assemblies. Simple and readable, it suits low-complexity products. Example: a table described as a top, four legs, and screws.
  • The multi-level BOM: it unfolds the whole tree, with the sub-assemblies and their own components, across several tiers. Essential for complex products, it lets you drive the manufacturing and supply of each sub-assembly.

Other variants exist depending on the use: the manufacturing BOM (shop-floor oriented, with the assembly order), the engineering BOM (from the design office), or the as-built BOM that reflects the product actually delivered. So a single product can have several BOM views depending on which department consults it.

Good reflex

On a simple product, do not overload the BOM by splitting it into pointless sub-assemblies. Conversely, on a complex product, breaking it into reusable sub-assemblies saves a lot of time, because the same sub-assembly serves several products.

Looking for software that manages BOMs?

Our comparison ranks the best ERP software of 2026, multi-level BOM management included, tested and judged.

See the best ERPs →

A concrete example: the bill of materials of a bike

Take a bike to illustrate a multi-level BOM. At the first level, the bike consists, for example, of a frame (1), two wheels (2), two pedals (2) and a drivetrain (1). So far, that is a single-level view.

But some of these components are themselves sub-assemblies. A wheel breaks down at the next level into a rim (1), spokes (say 32), a hub (1) and a tire (1). The drivetrain breaks down into chainrings, sprockets and a chain. You end up with a tree across several tiers:

LevelItemQuantity
0Bike (finished product)1
1Frame1
1Wheel (sub-assembly)2
2Rim1 per wheel
2Spoke32 per wheel
2Tire1 per wheel
1Drivetrain (sub-assembly)1

Thanks to this tree, software instantly works out that producing 100 bikes requires 200 wheels, so 200 rims, 6,400 spokes and 200 tires, without a single manual calculation. This ability to propagate quantities tier by tier is what makes the BOM combined with the requirements calculation so powerful.

A wrong BOM contaminates everything

An outdated BOM (wrong quantity, component replaced but not updated) produces wrong orders, stockouts and mistaken product costs. Keeping BOMs rigorously up to date, at every product change, is a non-negotiable discipline.

What is the link between a BOM and an ERP?

A bill of materials is only valuable if it is shared and used by the functions that depend on it. That is the role of the ERP, which centralizes BOMs in a single database and makes them available to several modules:

  • Material requirements planning (MRP) multiplies the BOMs by the production plan to determine what to buy or make, and when.
  • Purchasing triggers component orders at the right moment, based on lead times.
  • Product costing adds up the cost of the components (plus labor and overhead) to value the finished product.
  • Production issues the work orders and pick lists for the shop floor from the manufacturing BOM.

This centralization is what avoids re-keying and conflicting versions. To place the BOM within the full set of inventory and production methods, our guide on how to manage inventory sets the wider scene.

Ready to move to the shortlist?

We compared the main ERPs on price, BOM management and the requirements calculation.

Our best ERP software 2026 →

The next step

To go further, read our comparison of the best ERP software 2026, our definition of material requirements planning (MRP) that uses the BOM, or our guide to managing inventory.

Frequently asked questions

What does a bill of materials (BOM) mean?

A bill of materials is the structured list of every component needed to make a product: raw materials, parts and sub-assemblies, each with its quantity. It is the industrial equivalent of a recipe, stating what a product is made of and in what quantity. The acronym BOM stands for bill of materials.

What is the difference between a single-level and a multi-level BOM?

The single-level BOM lists the components of the finished product directly on one tier, without detailing the sub-assemblies; it suits simple products. The multi-level BOM unfolds the whole tree, with the sub-assemblies and their own components across several tiers; it is essential for complex products.

What is a BOM used for in an ERP?

In an ERP, the BOM is the master data that feeds several modules: material requirements planning (MRP) that determines what to buy or make, purchasing, product costing and production. Centralizing it in a single database avoids re-keying and conflicting versions between departments.

Can a single product have several BOMs?

Yes. A single product can have several views: an engineering BOM from the design office, a manufacturing BOM oriented to the shop floor with the assembly order, and an as-built BOM reflecting the product actually delivered. Each department consults the view suited to its use, from the same base data.

Why is keeping BOMs up to date so critical?

Because every function that depends on it inherits its errors. An outdated BOM, with a wrong quantity or a component replaced but not refreshed, generates wrong orders, stockouts and mistaken product costs. Updating BOMs at every product change is therefore an essential discipline.